1978Queens / New York CityCivic / Infrastructure

TWA Flight Wing 1 — terminal improvement work

Joseph's second TWA entry catches the famous terminal after the Jet Age dream had already become a traffic problem: Flight Wing 1 was only eight years old when TWA was modifying the complex again.

TWA Flight Wing 1 — terminal improvement work — The Trans World Airlines terminal at Idlewild under construction, photographed by Balthazar Korab. Construction context for the site, not the terminal improvement work recorded on the list.

Construction at the TWA terminal, 1956–62. Kelly's later improvement work is a separate scope and is not what this photograph shows.

1962 · Balthazar Korab · Library of Congress via Wikimedia Commons · Source

01The story

Why this project matters

Project identity
Very strong
Kelly connection
Family source
Masonry scope
Probable

Rita’s list

Rita Bartscherer’s handwritten entry: TWA Flight Wing #1 — 1978

Transcription: TWA Flight Wing #1 — 1978

Recorded by Rita Bartscherer · Bartscherer family record

Entry

KM-131

Sheet

2 of two

As written

TWA Flight Wing #1 — 1978

Flight Wing 1 opened in 1970. In 1978 TWA rerouted terminal traffic and added a 330-foot passenger canopy carried by 11 Y-shaped precast-concrete columns; the exact Kelly package is still unconfirmed.

Why it matters

One of the best repeat-client stories in the archive: the family list may place Joseph at TWA during the original Jet Age build-out and then again in 1978, when the same celebrated terminal was already being altered to cope with the passenger volumes and larger aircraft it helped usher in.

02What Kelly did

What Kelly did here

Kelly connection

Family source

Scope confidence

Probable

Likely: selective masonry alteration: likely CMU/block partitions and fire-rated walls, infill or enlargement of openings, patching/rebuilding of existing masonry, and localized brick/stone work rather than the building's original structural frame.

This scope is recorded as probable, not documented. It is a disciplined reading of the building and the trade practice of the period, not a contract-level record of Kelly’s work.

03Who built it

The construction team

  1. 01Architect

    Roche-Dinkeloo (Flight Wing 1, 1967–70); Witthoefft & Rudolf (1978 roadway/canopy project)

04What happened

What happened to it

Flight Wing 1 demolished / TWA headhouse preserved and reused as TWA Hotel

What happens next

Flight Wing 1 no longer survives. The Saarinen headhouse is preserved as the TWA Hotel, while the surrounding airport functions as JetBlue's Terminal 5 complex.

On the map

TWA Flight Center / Terminal 5 complex, John F. Kennedy International Airport, Queens, NY

Flight Wing 1 demolished / TWA headhouse preserved and reused as TWA Hotel

Sources

3 citedOpen →
What this record rests on
  1. 01
    panynj.gov

    TWA Flight Cente EA FONSI ROD 083116

  2. 02
    architecture-history.org

    Designing TWA, Eero Saarinen's Airport Terminal in New York

  3. 03
    commons.wikimedia.org

    File:Trans World Airlines Terminal, John F. Kennedy (originally Idlewild) Airpor

Image credits

Know something about this project?

Share a correction, memory, photograph, source or connection to this project. Every submission is reviewed before anything is published.

Add to this record →

Elsewhere in the archive

1959KM-031

American Airlines Terminal at Idlewild

Family list: “A.A. Arrivals Building

Queens / New York City

Original terminal demolished / replaced by current Terminal 8Project identified