1951Rockaway, Queens, New YorkCivic / Infrastructure

Rockaway Wastewater Resource Recovery Facility

One of Joseph's least glamorous jobs may also be one of the most essential.

Rockaway Wastewater Resource Recovery Facility — Looking north at the Rockaway Wastewater Treatment Plant, at the Rockaway Freeway and Beach 108th Street in Seaside / Rockaway Park, Queens. Looking from a Rockaway Park–Beach 116th Street-bound…. Photographed in 2018; a current view, not a construction-period photograph.

Looking north at the Rockaway Wastewater Treatment Plant, at the Rockaway Freeway and Beach 108th Street in Seaside / Rockaway Park, Queens. Looking from a Rockaway Park–Beach 116th Street-bound…. Photographed in 2018; a current view, not a construction-period photograph.

Current view · 2018 · Photo: Tdorante10 · CC BY-SA 4.0 · Source

01The story

Why this project matters

Project identity
Verified
Kelly connection
Family source
Masonry scope
Probable

Rita’s list

Rita Bartscherer’s handwritten entry: Rockaway Sewage Plant — 1951

Transcription: Rockaway Sewage Plant — 1951

Recorded by Rita Bartscherer · Bartscherer family record

Entry

KM-013

Sheet

1 of two

As written

Rockaway Sewage Plant — 1951

DEP records say the first stage of Rockaway's wastewater plant was built in 1951 and opened in 1952.

Why it matters

A piece of invisible city-building: Joseph's masonry helped create infrastructure that still treats wastewater for the Rockaway Peninsula.

02What Kelly did

What Kelly did here

Kelly connection

Family source

Scope confidence

Probable

Likely: most likely heavy-duty CMU/concrete-block enclosure and equipment-room walls, interior partitions, shafts and masonry backup; specialized refractory/stone work should not be assumed without specifications.

This scope is recorded as probable, not documented. It is a disciplined reading of the building and the trade practice of the period, not a contract-level record of Kelly’s work.

03Who built it

The construction team

The construction team for this job has not yet been established.

04What happened

What happened to it

Still standing

On the map

106-21 Beach Channel Drive, Queens, NY

Still standing

Sources

2 citedOpen →
What this record rests on
  1. 01
    nyc.gov

    wpcpPlantra

  2. 02
    nyc.gov

    jamaica bay feasibility study

Image credits
  • Tdorante10 · CC BY-SA 4.0 · Wikimedia Commons · Taken on 2

    Looking north at the Rockaway Wastewater Treatment Plant, at the Rockaway Freeway and Beach 108th Street in Seaside / Rockaway Park, Queens. Looking from a Rockaway Park–Beach 116th Street-bound…. Photographed in 2018; a current view, not a construction-period photograph.

Know something about this project?

Share a correction, memory, photograph, source or connection to this project. Every submission is reviewed before anything is published.

Add to this record →

Elsewhere in the archive

1959KM-031

American Airlines Terminal at Idlewild

Family list: “A.A. Arrivals Building

Queens / New York City

Original terminal demolished / replaced by current Terminal 8Project identified