1985Manhattan, New YorkHospital / Health

Presbyterian Hospital modernization

Kelly Masonry had a documented masonry contract on Presbyterian Hospital new construction and renovation during the hospital’s major 1980s modernization.

Presbyterian Hospital modernization — The Herbert Irving Pavilion and Milstein Hospital Building, photographed in 2014. Kelly's masonry contract for the Presbyterian modernization is documented; the Milstein building remains the leading identification pending confirmation of the original subcontract.

The Herbert Irving Pavilion and Milstein Hospital Building, photographed in 2014. Kelly's masonry contract for the Presbyterian modernization is documented; the Milstein building remains the leading identification pending confirmation of the original subcontract.

Current view · 2014 · Photo: Beyond My Ken · CC BY-SA 4.0 · Source

01The story

Why this project matters

Project identity
Verified
Kelly connection
Documented
Masonry scope
Documented

Rita’s list

Rita Bartscherer’s handwritten entry: Presbyterian Hospital — 1985

Transcription: Presbyterian Hospital — 1985

Recorded by Rita Bartscherer · Bartscherer family record

Entry

KM-182

Sheet

2 of two

As written

Presbyterian Hospital — 1985

Court records document Kelly Masonry’s contract for masonry on Presbyterian Hospital construction and renovation; the surviving record does not identify every building covered by that contract.

Why it matters

One of the strongest direct links between Kelly Masonry and a major late-career institutional construction program.

02What Kelly did

What Kelly did here

Kelly connection

Documented

Scope confidence

Documented

Kelly was contractually responsible for the masonry work in Presbyterian Hospital's modernization program under Walsh Construction. Most likely work included the new hospital's brick masonry envelope/backup plus CMU partitions, shafts and service walls; the exact division between Milstein, Allen and renovation areas still needs the subcontract.

Direct Kelly evidence

1990 appellate decision: Walsh Construction entered into a contract with Kelly to perform the masonry work.

03Who built it

The construction team

  1. 01Owner / client

    Presbyterian Hospital in the City of New York

  2. 02GC / construction manager

    Walsh Construction Co. (CM); Tishman project manager on Milstein

  3. 03Masonry

    Kelly Masonry

04What happened

What happened to it

Altered

On the map

622 West 168th Street, New York, NY 10032

Altered

Sources

4 citedOpen →
What this record rests on
  1. 01
    leagle.com

    1990352160ad2d1921308

  2. 02
    library-archives.cumc.columbia.edu

    columbia university irving medical center construction chronology 1925 present

  3. 03
  4. 04
    usmodernist.org

    AR 1991 10

Image credits
  • Beyond My Ken · CC BY-SA 4.0 · Wikimedia Commons · Taken on 4

    The Herbert Irving Pavilion and Milstein Hospital Building, photographed in 2014. Kelly's masonry contract for the Presbyterian modernization is documented; the Milstein building remains the leading identification pending confirmation of the original subcontract.