1967Buchanan / Westchester County, NYCivic / Infrastructure

Indian Point Unit 2

Joseph’s 1967 entry falls during the major expansion of Indian Point Unit 2.

Indian Point Unit 2 — The Indian Point Energy Center seen from Dunderberg Mountain in 2024 — a plant-wide view. Nothing here is identified as Unit 2 or as Kelly's work area.

The Indian Point Energy Center seen from Dunderberg Mountain in 2024 — a plant-wide view. Nothing here is identified as Unit 2 or as Kelly's work area.

Current view · 2024 · Photo: Mr. Matté · CC BY-SA 4.0 · Source

01The story

Why this project matters

Project identity
Very strong
Kelly connection
Family source
Masonry scope
Probable

Rita’s list

Rita Bartscherer’s handwritten entry: Indian Point — 1967

Transcription: Indian Point — 1967

Recorded by Rita Bartscherer · Bartscherer family record

Entry

KM-057

Sheet

1 of two

As written

Indian Point — 1967

Unit 2 was under construction in 1967 and Con Edison applied to build Unit 3 that April.

Why it matters

The project connects the family list to the physical expansion of one of New York’s most consequential power-generation sites.

02What Kelly did

What Kelly did here

Kelly connection

Family source

Scope confidence

Probable

Likely: most likely CMU/block service and support-building walls, fire-rated partitions, equipment-area masonry and other conventional plant masonry. Do not attribute containment or specialty nuclear structural concrete to Kelly without contract proof.

This scope is recorded as probable, not documented. It is a disciplined reading of the building and the trade practice of the period, not a contract-level record of Kelly’s work.

03Who built it

The construction team

  1. 01Owner / client

    Consolidated Edison

  2. 02GC / construction manager

    United Engineers & Constructors (site construction management)

04What happened

What happened to it

Nuclear station retired / decommissioning underway

What happens next

Indian Point is permanently shut down and undergoing NRC-regulated decommissioning; Units 1, 2 and 3 remain in DECON status.

On the map

Buchanan / Westchester County, NY

Nuclear station retired / decommissioning underway

Sources

4 citedOpen →
What this record rests on
  1. 01
    nrc.gov

    index

  2. 02
    govinfo.gov

    FR 1967 05 16

  3. 03
  4. 04
Image credits
  • Mr. Matté · CC BY-SA 4.0 · Wikimedia Commons · 2024-11-23

    The Indian Point Energy Center seen from Dunderberg Mountain in 2024 — a plant-wide view. Nothing here is identified as Unit 2 or as Kelly's work area.

Know something about this project?

Share a correction, memory, photograph, source or connection to this project. Every submission is reviewed before anything is published.

Add to this record →

Elsewhere in the archive

1959KM-031

American Airlines Terminal at Idlewild

Family list: “A.A. Arrivals Building

Queens / New York City

Original terminal demolished / replaced by current Terminal 8Project identified